15th March, 2026

51 Hub Cresent, Heathwood,

Heathwood, QLD

Donway Developments were engaged by C3 Construction Group to deliver the formwork package for the tilt-up concrete panels at their project located at 51 Hub Crescent. Working in collaboration with the project team, Donway provided specialist formwork solutions designed to achieve the high level of precision and structural integrity required for tilt-up construction.

Our scope included the supply and installation of formwork systems to facilitate the casting of large-scale tilt panels on site, ensuring accurate dimensions, clean finishes, and efficient panel lifting and installation. Through careful planning, quality materials, and experienced supervision, the Donway team ensured the formwork met both engineering specifications and construction programme requirements.

Tilt-up construction demands a high degree of coordination between formwork, reinforcement, and lifting operations. Donway’s experienced crew worked closely with site management and associated trades to deliver a streamlined process that prioritised safety, efficiency, and build quality.

This project reflects Donways ongoing commitment to providing reliable, high-quality formwork services across commercial and industrial developments.

Previous
Previous

NP Pump Station