Commerical

270 Waterworks Rd, Ashgrove

Slab, column & stair formwork ·

SJ Higgins

Sector
Commerical
Location
270 Waterworks Rd, Ashgrove QLD
Head contractor
SJ Higgins
Scope
Suspended slabs, columns & stairs
Status
Completed

Project overview

Project Feature: 270 Waterworks Rd, Ashgrove | Formwork Package

Donway Developments completed the structural formwork for SJ Higgins on this Commerical build at 270 Waterworks rd, Ashgrove. Our crew handled both the installation and the stripping of every element in our scope, keeping the concrete program moving from setup through to handover.

Our scope

  • Suspended slab formwork: Engineered deck formwork for the suspended concrete slab with down-turn wall into the stairs.

  • Stair formwork: Conventional formwork stairs, built to suit the design and removed after the pour.

Previous
Previous

SEQH Stage 2, Port of Brisbane